South Flank mine - Newman, Western Australia
Address: Newman WA 6753, Australia.
Specialties: Mine.
Opinions: This company has 3 reviews on Google My Business.
Average opinion: 3.3/5.
📌 Location of South Flank mine
⏰ Open Hours of South Flank mine
- Monday: Open 24 hours
- Tuesday: Open 24 hours
- Wednesday: Open 24 hours
- Thursday: Open 24 hours
- Friday: Open 24 hours
- Saturday: Open 24 hours
- Sunday: Open 24 hours
Okay, here’s a detailed description of South Flank Mine, formatted as requested, aimed at providing comprehensive information for those researching this operation:
South Flank Mine: A Detailed Overview
For those seeking information about iron ore mining and specifically the South Flank operation, it's crucial to understand its significance within the Pilbara region of Western Australia. South Flank Mine, located in Newman, Western Australia, represents a strategically important asset for Fortescue Metals Group (FMG). It’s a modern, large-scale operation contributing substantially to Australia’s iron ore exports.
Address: Newman WA 6753, Australia.
Phone: (No publicly available phone number provided)
Website: (No publicly available website provided – information is primarily found through FMG’s corporate site)
Specialties: Mine – Primarily focused on the extraction and processing of high-grade iron ore.
Location and Characteristics:
The mine is situated approximately 370 kilometers northeast of Perth, in the Pilbara region. This location is vital due to its proximity to the coast, facilitating efficient shipping of the mined product. South Flank is characterized by its innovative, low-strip ratio open-cut design, meaning it requires less material removal compared to traditional mining methods. This optimization significantly reduces environmental impact and operational costs. Key features include:
- Open-Cut Mining: The primary extraction method, allowing for access to substantial ore deposits.
- Low-Strip Ratio: A core design principle aimed at minimizing waste rock removal.
- Advanced Processing Plant: Incorporates state-of-the-art technology for ore beneficiation and concentrate production.
- Rail Infrastructure: Connected to the rail network, ensuring transport to port facilities at Port Hedland.
Other Notable Information:
South Flank is not just a mining operation; it’s a significant contributor to the local economy and community. Fortescue Metals Group has invested heavily in local employment and training programs. The project has also been designed with a focus on sustainable mining practices, incorporating measures to minimize water usage and protect the surrounding environment. The operation utilizes a beneficiation plant to produce a high-grade concentrate, targeting a premium market.
Metric | Value |
---|---|
Ore Production (Annual) | 7.9 million tonnes (Projected) |
Concentrate Production (Annual) | 3.8 million tonnes |
Mine Life | Approximately 18 years |
Opinions: This company has 3 reviews on Google My Business.
Average Opinion: 3.3/5
It’s recommended that anyone interested in South Flank Mine consult Fortescue Metals Group’s official website (linked through their corporate site) for the most up-to-date information on operations, environmental performance, and community engagement. Due to the nature of the operation, real-time updates and detailed operational data are typically found through the company’s official channels.
Do you require any further elaboration on a specific aspect of the South Flank Mine, such as its environmental management practices or community investment initiatives